29 CFR 1910 · General Industry · Subpart Q

1910.252(c)(6)(ii): Indoor Welding with Zinc

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated October 24, 2026 3 min read

In plain words:

Indoors, welding or cutting involving zinc-bearing base or filler metals coated with zinc-bearing materials must follow paragraph (c)(3) of 1910.252.

Key takeaways

  • 1910.252(c)(6)(ii) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart Q).
  • OSHA cited it 13 times in the last 3 years, in 13 inspections, with $18,078 in current penalties.
  • Most citations: MN (3), MI (3), IL (1).
  • Related part: 1910.252(c) Health protection and ventilation (72 citations).
  • Free 5-minute toolbox talk for your crew below.
13citations, 3 years
$18,078current penalties
13inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.252(c)(6)(ii) ("Indoors") is one requirement inside 1910.252 General requirements, an OSHA general industry standard (Part 1910, Subpart Q). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(ii) Indoors. Indoors, welding or cutting involving zinc-bearing base or filler metals coated with zinc-bearing materials shall be done in accordance with paragraph (c)(3) of this section. 13 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.252.

Where and how often it was cited

YearCitations
20242
20254
20267

Top states: MN (3), MI (3), IL (1), PA (1), NM (1)

Largest penalties

EmployerLocationPenalty for this rule
GLOBAL FINISHING SOLUTIONS, LLCOSSEO, WI$6,753
ACS MANUFACTURING, INC.CLEARFIELD, UT$2,940
SECURITY DOOR & HARDWARE CO.URBANA, IL$2,581
RICHARD R PUCCI & ASSOCIATESWARMINSTER, PA$1,929
108283 - NORTHLAND CONSTRUCTION - FENCE LLCANOKA, MN$1,600

Free toolbox talk

A 5-minute crew talk on 1910.252(c)(6)(ii), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.252(c)(6)(ii).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What does this paragraph require?

Indoor welding or cutting involving zinc-bearing metals must be done in accordance with paragraph (c)(3).

Does this apply outdoors?

This paragraph covers indoor work.

Which standard is this?

29 CFR 1910.252, welding, cutting and brazing.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top