29 CFR 1910 · General Industry · Subpart S

1910.303(c): Electrical Connections, Terminals and Splices

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated November 6, 2026 4 min read

In plain words:

Connectors and lugs must be identified for the conductor material and properly installed, and dissimilar metals such as copper and aluminum may not be mixed in a connector unless it is identified for that use. Terminal connections must be good without damaging conductors, and splices must use identified devices or brazing, welding or soldering, with all splices and free ends insulated equal to the conductors.

Key takeaways

  • 1910.303(c) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart S).
  • OSHA cited it 56 times in the last 3 years, in 56 inspections, with $153,143 in current penalties.
  • 1 death is linked to inspections that cited this rule.
  • Most citations: PR (9), VA (5), GA (5).
  • Related part: 1910.303(c)(3) Splices (52 citations).
  • Free 5-minute toolbox talk for your crew below.

Get the free 5-minute toolbox talk on 1910.303(c) ↓

56citations, 3 years
$153,143current penalties
56inspections
1linked deaths
In this article
  1. What this rule covers
  2. Official text
  3. Injuries linked to this rule
  4. Where and how often it was cited
  5. Free toolbox talk
  6. OSHA interpretation letters
  7. Related parts of this rule
  8. Get your crew competent
  9. Frequently asked questions
  10. About this page

What this rule covers

29 CFR 1910.303(c) ("Electrical connections") is one requirement inside 1910.303 General, an OSHA general industry standard (Part 1910, Subpart S). It includes 10 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(c) Electrical connections — 56 citations

(1) General. Because of different characteristics of dissimilar metals:

(i) Devices such as pressure terminal or pressure splicing connectors and soldering lugs shall be identified for the material of the conductor and shall be properly installed and used;

(ii) Conductors of dissimilar metals may not be intermixed in a terminal or splicing connector where physical contact occurs between dissimilar conductors (such as copper and aluminum, copper and copper-clad aluminum, or aluminum and copper-clad aluminum) unless the device is identified for the purpose and conditions of use; and

(iii) Materials such as solder, fluxes, inhibitors, and compounds, where employed, shall be suitable for the use and shall be of a type that will not adversely affect the conductors, installation, or equipment.

(2) Terminals. 2 citations

(i) Connection of conductors to terminal parts shall ensure a good connection without damaging the conductors and shall be made by means of pressure connectors (including set-screw type), solder lugs, or splices to flexible leads. However, No. 10 or smaller conductors may be connected by means of wire binding screws or studs and nuts having upturned lugs or equivalent. 2 citations

(ii) Terminals for more than one conductor and terminals used to connect aluminum shall be so identified.

(3) Splices. Open (c)(3) 52 citations

(i) Conductors shall be spliced or joined with splicing devices identified for the use or by brazing, welding, or soldering with a fusible metal or alloy. Soldered splices shall first be spliced or joined to be mechanically and electrically secure without solder and then soldered. All splices and joints and the free ends of conductors shall be covered with an insulation equivalent to that of the conductors or with an insulating device identified for the purpose. Open (c)(3)(i) 51 citations

(ii) Wire connectors or splicing means installed on conductors for direct burial shall be listed for such use. 1 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.303.

See every company cited for this rule.

Export the list: 56 inspections cited 1910.303(c) in the last 3 years, with employer, location, penalty and date.

Purple Belt, $59/mo

Injuries linked to this rule

1 death is linked to inspections where OSHA cited 1910.303(c).

One employee is killed, another employee fractures both legs
2024-01-19 · Fatal · BAY SAINT LOUIS, MS

At 9:00 a.m. on January 19, 2024, two employees (Employee #1 and Employee #2) were setting up the site to create another stack of steel pipes (30 inches in diameter by 40 feet long, weighing over 2,000 pounds each.) The employees removed the chock block…

Where and how often it was cited

YearCitations
20234
202419
202528
20265

Top states: PR (9), VA (5), GA (5), TX (4), FL (4)

Largest penalties

EmployerLocationPenalty for this rule
THE GOODYEAR TIRE & RUBBER COMPANYDANVILLE, VA$13,415
AEEYAUCO, PR$11,823
CARL'S DONUTS, INC.LAS VEGAS, NV$10,046
EMPRESAS V�ZQUEZ CORP.VEGA ALTA, PR$8,038
C&C DFM- PBEM TRAFFIC ELECTRICAL MAINTENANCE SERVICES BRANCHPEARL CITY, HI$7,035

Free toolbox talk

A 5-minute crew talk on 1910.303(c), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.303(c).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

Can copper and aluminum be joined in the same connector?

Only if the device is identified for the purpose and conditions of use.

How must soldered splices be made?

They must first be spliced to be mechanically and electrically secure without solder, then soldered.

Do splices need insulation?

Yes. All splices, joints and free ends must be covered with insulation equivalent to the conductors or an identified insulating device.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top