29 CFR 1926 · Construction · Subpart Z

1926.1101(g)(1)(ii): Wet Methods for Asbestos Work

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated October 20, 2026 3 min read

In plain words:

Employers must use wet methods or wetting agents to control employee exposure during asbestos handling, mixing, removal, cutting, application and cleanup. The exception is where employers show wet methods are infeasible, for example due to electrical hazards or equipment malfunction, and in roofing as provided in paragraph (g)(8)(ii).

Key takeaways

  • 1926.1101(g)(1)(ii) is part of OSHA's construction standards (29 CFR Part 1926, Subpart Z).
  • OSHA cited it 16 times in the last 3 years, in 16 inspections, with $26,726 in current penalties.
  • Most citations: OR (5), VA (3), NV (3).
  • Related part: 1926.1101(g) Methods of compliance (297 citations).
  • Free 5-minute toolbox talk for your crew below.
16citations, 3 years
$26,726current penalties
16inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1926.1101(g)(1)(ii) is one requirement inside 1926.1101 Asbestos, an OSHA construction standard (Part 1926, Subpart Z). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(ii) Wet methods, or wetting agents, to control employee exposures during asbestos handling, mixing, removal, cutting, application, and cleanup, except where employers demonstrate that the use of wet methods is infeasible due to for example, the creation of electrical hazards, equipment malfunction, and, in roofing, except as provided in paragraph (g)(8)(ii) of this section; and 16 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1926.1101.

Where and how often it was cited

YearCitations
202410
20254
20262

Top states: OR (5), VA (3), NV (3), NY (2), NC (1)

Largest penalties

EmployerLocationPenalty for this rule
THERMAL SOLUTIONS, INC.GLEN LYN, VA$5,500
TOWNSHIP OF TOMS RIVER DEPARTMENT OF PUBLIC WORKSTOMS RIVER, NJ$5,000
EDGE RESTORATION LAS VEGAS, LLCLAS VEGAS, NV$4,839
BLUE CITY CONSTRUCTION CORP.MIDDLE VILLAGE, NY$3,547
317735846 - BOULDER CREEK CONSTRUCTION LLC OF WASHINGTONPORTLAND, OR$2,882

Free toolbox talk

A 5-minute crew talk on 1926.1101(g)(1)(ii), plus alerts when this rule changes. Free.




OSHA interpretation letters

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

When are wet methods required for asbestos?

During asbestos handling, mixing, removal, cutting, application, and cleanup.

When can wet methods be skipped?

When the employer demonstrates they are infeasible, for example due to electrical hazards or equipment malfunction, and in roofing as provided in paragraph (g)(8)(ii).

What can be used besides plain water?

Wetting agents.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top