OSHA company record
77149 - Tracys Deer Processing Plant LLC OSHA inspections, violations & penalties · Sumter, SC
- Inspections since 2023
- 1
- Citations
- 4
- Current penalties
- $6,000
- Willful
- 0
- Repeat
- 0
77149 - Tracys Deer Processing Plant LLC had 1 OSHA inspection since 2023, with 4 citations and $6,000 in current penalties. The most-cited rule is 29 CFR 1910.147, The control of hazardous energy (lockout/tagout) (3 citations).
Work at 77149 - Tracys Deer Processing Plant LLC?
Get a free training plan for the 1 rule OSHA cited here
We match each citation to the training that covers it and send a plan with pricing for your crew. Free, no obligation.
Black Belt Safety is not part of OSHA and cannot change or remove a record.
OSHA inspections at 77149 - Tracys Deer Processing Plant LLC
Open any inspection for its cited standards, penalties and abatement dates.
| Opened | Inspection | Type | Status | Citations | Current penalty |
|---|---|---|---|---|---|
| November 20, 2025 | 348620774 | Referral | Closed | 4 | $6,000 |
Penalties by citation type
OSHA standards 77149 - Tracys Deer Processing Plant LLC was cited for
Each rule links to its plain-English page with the official text, how often OSHA cites it nationwide, and training that covers it.
3 citations · $4,500
The control of hazardous energy (lockout/tagout)
- 1910.147(c)(1) Energy control program
- 1910.147(c)(4)(i)
- 1910.147(d)(2) Machine or equipment shutdown
Source standard code: 3.39(A)
1 citation · $1,500
Prevent the next citation
Most of these citations trace back to training, competent-person oversight and written programs. Fix those before OSHA arrives.
Questions about 77149 - Tracys Deer Processing Plant LLC’s OSHA record
How many times has OSHA inspected 77149 - Tracys Deer Processing Plant LLC?
OSHA records list 1 inspection of 77149 - Tracys Deer Processing Plant LLC in Sumter, SC since 2023.
How much has 77149 - Tracys Deer Processing Plant LLC been fined by OSHA?
Since 2023: $6,000 in initial proposed penalties and $6,000 in current penalties across 4 citations.
What OSHA violations has 77149 - Tracys Deer Processing Plant LLC been cited for?
Most-cited sections since 2023, with citation counts: 29 CFR 1910.147 (The control of hazardous energy (lockout/tagout)): 3; state-plan code: 1.
Is this the same company as other 77149 - Tracys Deer Processing Plant LLC locations?
Not necessarily. OSHA publishes records by establishment, so this page covers Sumter, SC only. Names merged here: 77149 - TRACYS DEER PROCESSING PLANT LLC.