29 CFR 1926 · Construction · Subpart K

1926.404(b)(1)(i): GFCIs or Assured Grounding Program

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated October 19, 2026 3 min read

In plain words:

Employers must protect construction workers by using either ground fault circuit interrupters (GFCIs) or an assured equipment grounding conductor program, as described in this section. These requirements are in addition to any other requirements for equipment grounding conductors.

Key takeaways

  • 1926.404(b)(1)(i) is part of OSHA's construction standards (29 CFR Part 1926, Subpart K).
  • OSHA cited it 41 times in the last 3 years, in 41 inspections, with $101,607 in current penalties.
  • Most citations: PR (13), NY (6), IL (5).
  • Related part: 1926.404(b) Branch circuits (138 citations).
  • Free 5-minute toolbox talk for your crew below.
41citations, 3 years
$101,607current penalties
41inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1926.404(b)(1)(i) ("General") is one requirement inside 1926.404 Wiring design and protection, an OSHA construction standard (Part 1926, Subpart K). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(i) General. The employer shall use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. These requirements are in addition to any other requirements for equipment grounding conductors. 41 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1926.404.

Where and how often it was cited

YearCitations
20232
202420
202516
20263

Top states: PR (13), NY (6), IL (5), NH (4), HI (3)

Largest penalties

EmployerLocationPenalty for this rule
RFX2024XAM866X0034 - REFRIGERATION UNLIMITED, LLCGOODYEAR, AZ$16,131
GENERA PR LLCGUAYANILLA, PR$7,000
URX2024XAM866X0035 - ELEVEN WESTERN BUILDERS INC.GOODYEAR, AZ$6,452
FUN CITY LLCHARRISBURG, PA$6,384
DBR DEVELOPMENT MANAGEMENT LLCDORADO, PR$4,250

Free toolbox talk

A 5-minute crew talk on 1926.404(b)(1)(i), plus alerts when this rule changes. Free.




OSHA interpretation letters

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What are the two options for ground-fault protection on construction sites?

Ground fault circuit interrupters as specified in 1926.404(b)(1)(ii), or an assured equipment grounding conductor program as specified in 1926.404(b)(1)(iii).

Who must provide this protection?

The employer must use one of the two methods to protect employees on construction sites.

Does this replace other grounding rules?

No. These requirements are in addition to any other requirements for equipment grounding conductors.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top