29 CFR 1926 · Construction · Subpart K

1926.405(g)(1)(iii)(C): No Flexible Cords Through Doorways or Windows

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated October 19, 2026 3 min read

In plain words:

Unless specifically permitted, construction employers must not use flexible cords where they are run through doorways, windows or similar openings, except as permitted in paragraph (a)(2)(ii)(I) of 1926.405.

Key takeaways

  • 1926.405(g)(1)(iii)(C) is part of OSHA's construction standards (29 CFR Part 1926, Subpart K).
  • OSHA cited it 12 times in the last 3 years, in 12 inspections, with $2,128 in current penalties.
  • Most citations: VA (7), MD (2), NY (1).
  • Related part: 1926.405(g) Flexible cords and cables (476 citations).
  • Free 5-minute toolbox talk for your crew below.
12citations, 3 years
$2,128current penalties
12inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1926.405(g)(1)(iii)(C) is one requirement inside 1926.405 Wiring methods, components, and equipment for general use, an OSHA construction standard (Part 1926, Subpart K). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(C) Where run through doorways, windows, or similar openings, except as permitted in paragraph (a)(2)(ii)(I) of this section; 12 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1926.405.

Where and how often it was cited

YearCitations
20244
20257
20261

Top states: VA (7), MD (2), NY (1), AR (1), IL (1)

Largest penalties

EmployerLocationPenalty for this rule
R SOLIS CONSTRUCTION LLCNORTH LITTLE ROCK, AR$2,128
COLT BUILDERS CORPBALTIMORE, MD$0
CHRISTIAN SIDING LLC.HYATTSVILLE, MD$0
RINGENBERG CONSTRUCTION LLCSUFFOLK, VA$0
CURRENT ELECTRICAL CONTRACTING LLCSUFFOLK, VA$0

Free toolbox talk

A 5-minute crew talk on 1926.405(g)(1)(iii)(C), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1926.405(g)(1)(iii)(C).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

Can extension cords run through doorways on a construction site?

Not as a general use; flexible cords may not be run through doorways, windows or similar openings except as permitted in 1926.405(a)(2)(ii)(I).

Why is running cords through doors a problem?

Doors and windows can pinch and damage cords.

Is there an exception?

Yes, the use permitted in paragraph (a)(2)(ii)(I) of 1926.405.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top