W&W Steel, LLC: OSHA inspection 348651373
OSHA inspections and violations, searchable by company, state, ZIP, industry (NAICS) and penalty. Data is copied nightly from the U.S. Department of Labor.
Closed case Planned inspection
W&W Steel, LLC OSHA violations & penalties
- Violations
- 4
- Proposed penalty
- $11,349
- Willful
- 0
- Repeat
- 0
- Serious
- 0
OSHA opened inspection 348651373 at W&W Steel, LLC in Camden, NJ on December 18, 2025 (planned inspection). The record lists 4 violations, with $11,349 in proposed penalties. The most-cited rule was 29 CFR 1910.36, Design and construction requirements for exit routes (1 citation).
Penalties by citation type
OSHA standards cited in this inspection
Each rule links to its plain-English page with the official text, how often OSHA cites it nationwide, and training that covers it.
1 citation · $2,837
Compressed gases (general requirements)
- 1910.101(b) Compressed gases
1 citation · $0
Maintenance, safeguards, and operational features for exit routes
Training for 1910.37 →Don’t be the next inspection on this list
Most of these citations trace back to training, competent-person oversight and written programs. Fix those before OSHA arrives.
All 4 citations
Cited standards as published by the source, not predicted violations. “Abate by” is the date OSHA set for the hazard to be fixed.
| Citation | Standard | Type | Exposed | Initial penalty | Current penalty | Abate by |
|---|---|---|---|---|---|---|
| 01001A | 1910.36(d)(1) | Other-than-serious | 3 | $4,965.00 | $4,965.00 | May 18, 2026 |
| 01001B | 1910.37(a)(3) | Other-than-serious | 3 | $0.00 | $0.00 | Not provided |
| 01002 | 1910.101(b) Compressed gases | Other-than-serious | 3 | $2,837.00 | $2,837.00 | Not provided |
| 01003 | 1910.253(b)(4)(iii) | Other-than-serious | 3 | $3,547.00 | $3,547.00 | Not provided |
Questions about this inspection
How much was W&W Steel, LLC fined by OSHA?
For inspection 348651373, OSHA proposed $11,349 in penalties. The case is closed.
What OSHA standards was W&W Steel, LLC cited for?
Most-cited sections in this inspection, with citation counts: 29 CFR 1910.36 (Design and construction requirements for exit routes): 1; 29 CFR 1910.253 (Oxygen-fuel gas welding and cutting): 1; 29 CFR 1910.101 (Compressed gases (general requirements)): 1; 29 CFR 1910.37 (Maintenance, safeguards, and operational features for exit routes): 1.
Is OSHA inspection 348651373 closed?
Yes. The source lists the case as closed 2026-05-15.
Where does this OSHA data come from?
From public U.S. Department of Labor OSHA enforcement records, copied nightly. Check the official record on osha.gov before relying on it.
