1910.179(b)(5): Crane Rated Load Marking
Employers must mark the rated load of an overhead or gantry crane plainly on each side of the crane. If the crane has more than one hoisting unit, each hoist must have its rated load marked on it or its load block, clearly legible from the ground or floor.
Key takeaways
- 1910.179(b)(5) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart N).
- OSHA cited it 33 times in the last 3 years, in 33 inspections, with $101,657 in current penalties.
- Most citations: NJ (8), TX (3), NY (3).
- Related part: 1910.179(b) General requirements (62 citations).
- Free 5-minute toolbox talk for your crew below.
Get the free 5-minute toolbox talk on 1910.179(b)(5) ↓
In this article
What this rule covers
29 CFR 1910.179(b)(5) ("Rated load marking") is one requirement inside 1910.179 Overhead and gantry cranes, an OSHA general industry standard (Part 1910, Subpart N). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
(5) Rated load marking. The rated load of the crane shall be plainly marked on each side of the crane, and if the crane has more than one hoisting unit, each hoist shall have its rated load marked on it or its load block and this marking shall be clearly legible from the ground or floor. 33 citations
Source: eCFR, text current as of 2026-10-15. Read all of 1910.179.
Export the list: 33 inspections cited 1910.179(b)(5) in the last 3 years, with employer, location, penalty and date.
Purple Belt, $59/moWhere and how often it was cited
| Year | Citations |
|---|---|
| 2023 | 1 |
| 2024 | 13 |
| 2025 | 10 |
| 2026 | 9 |
Top states: NJ (8), TX (3), NY (3), OH (2), MD (2)
Largest penalties
| Employer | Location | Penalty for this rule |
|---|---|---|
| ALAMO STRUCTURAL STEEL, LLC | VICTORIA, TX | $14,895 |
| MODERN MACHINE SHOP, INC. | LAREDO, TX | $9,847 |
| GUERDON, LLC | BOISE, ID | $7,449 |
| SPRUCE RUN RECREATION AREA | CLINTON, NJ | $7,000 |
| HAILIANG COPPER TEXAS INC. | SEALY, TX | $6,920 |
Free toolbox talk
A 5-minute crew talk on 1910.179(b)(5), plus alerts when this rule changes. Free.
OSHA interpretation letters
None exist. OSHA has not published a letter of interpretation for 1910.179(b)(5).
Related parts of this rule
- 1910.179(b) General requirements 62 citations
- 1910.179(b)(6) Clearance from obstruction 12 citations
- 1910.179(b)(8) Designated personnel 12 citations
- 1910.179(b)(6)(i) 3 citations
- 1910.179(b)(2) New and existing equipment 2 citations
- 1910.179(b)(4) Wind indicators and rail clamps
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey
Trainers and suppliers: feature your business on this rule for $25/month.
Frequently asked questions
Where must a crane's rated load be marked?
Plainly on each side of the crane.
What if there is more than one hoist?
Each hoist must have its rated load marked on it or its load block.
Must the marking be readable from the floor?
Yes. It must be clearly legible from the ground or floor.
About this page
Sources
- 29 CFR 1910.179 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly; data as of 2026-11-17
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.
