29 CFR 1910 · General Industry · Subpart S

1910.303(g)(1)(iii): Entrance to Electrical Work Space

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated October 20, 2026 2 min read

In plain words:

Employers must provide at least one entrance of sufficient area to reach the working space around electric equipment.

Key takeaways

  • 1910.303(g)(1)(iii) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart S).
  • OSHA cited it 24 times in the last 3 years, in 24 inspections, with $38,225 in current penalties.
  • Most citations: NY (4), WI (3), VA (3).
  • Related part: 1910.303(g) 600 Volts, nominal, or less (3,265 citations).
  • Free 5-minute toolbox talk for your crew below.
24citations, 3 years
$38,225current penalties
24inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.303(g)(1)(iii) is one requirement inside 1910.303 General, an OSHA general industry standard (Part 1910, Subpart S). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(iii) At least one entrance of sufficient area shall be provided to give access to the working space about electric equipment. 24 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.303.

Where and how often it was cited

YearCitations
20232
202412
20259
20261

Top states: NY (4), WI (3), VA (3), VT (3), IN (2)

Largest penalties

EmployerLocationPenalty for this rule
INTEVA PRODUCTSBLUFFTON, IN$10,000
RIFLE HOLDINGS, LLCMAITLAND, FL$4,766
TAFCO CORPORATIONMELROSE PARK, IL$4,220
SIGN ENTERPRISE INC.FREDERICKSBURG, VA$4,090
KEES, INC.ELKHART LAKE, WI$3,840

Free toolbox talk

A 5-minute crew talk on 1910.303(g)(1)(iii), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.303(g)(1)(iii).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

How many entrances are required to electrical working space?

At least one entrance of sufficient area.

What is the entrance for?

To give access to the working space about electric equipment.

Can the entrance be blocked?

The rule requires an entrance that gives access, so blocking it defeats the requirement.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top