1 open case OSHA company record
Plastilene Inc OSHA inspections, violations & penalties · Washington Court House, OH
- Inspections since 2023
- 2
- Citations
- 9
- Current penalties
- $23,658
- Willful
- 0
- Repeat
- 0
Plastilene Inc had 2 OSHA inspections since 2023, with 9 citations and $23,658 in current penalties. The most-cited rule is 29 CFR 1910.147, The control of hazardous energy (lockout/tagout) (6 citations). One case is still open, so penalties may change.
Work at Plastilene Inc?
Get a free training plan for the 4 rules OSHA cited here
We match each citation to the training that covers it and send a plan with pricing for your crew. Free, no obligation.
Black Belt Safety is not part of OSHA and cannot change or remove a record.
OSHA inspections at Plastilene Inc
Open any inspection for its cited standards, penalties and abatement dates.
Penalties by citation type
OSHA standards Plastilene Inc was cited for
Each rule links to its plain-English page with the official text, how often OSHA cites it nationwide, and training that covers it.
6 citations · $16,421
The control of hazardous energy (lockout/tagout)
- 1910.147(c)(4)(i)
- 1910.147(c)(7)(i)(a)
- 1910.147(d) Application of control ×2
- 1910.147(c)(4)(ii)
- 1910.147(c)(7)(iv)
1 citation · $6,487
General requirements for all machines
- 1910.212(a)(1) Types of guarding
29 CFR 1904.32
1 citation · $500
- 1904.32(b)(6)
29 CFR 1903.2
1 citation · $250
- 1903.2(a)(1)
Prevent the next citation
Most of these citations trace back to training, competent-person oversight and written programs. Fix those before OSHA arrives.
Questions about Plastilene Inc’s OSHA record
How many times has OSHA inspected Plastilene Inc?
OSHA records list 2 inspections of Plastilene Inc in Washington Court House, OH since 2023.
How much has Plastilene Inc been fined by OSHA?
Since 2023: $66,287 in initial proposed penalties and $23,658 in current penalties across 9 citations. Open cases can still change.
What OSHA violations has Plastilene Inc been cited for?
Most-cited sections since 2023, with citation counts: 29 CFR 1910.147 (The control of hazardous energy (lockout/tagout)): 6; 29 CFR 1910.212 (General requirements for all machines): 1; 29 CFR 1904.32: 1; 29 CFR 1903.2: 1.
Is this the same company as other Plastilene Inc locations?
Not necessarily. OSHA publishes records by establishment, so this page covers Washington Court House, OH only. Names merged here: PLASTILENE INC.
