29 CFR 1910 · General Industry · Subpart S

1910.305(a)(1)(i): Bonding Metal Grounding Paths

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated October 20, 2026 3 min read

In plain words:

Metal raceways, cable trays, cable armor, enclosures, frames, fittings and other metal parts that serve as grounding conductors must be effectively bonded where needed for electrical continuity and to safely carry any likely fault current. Nonconductive paint or coatings must be removed at threads and contact points, or fittings must be used that make removal unnecessary.

Key takeaways

  • 1910.305(a)(1)(i) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart S).
  • OSHA cited it 19 times in the last 3 years, in 19 inspections, with $70,940 in current penalties.
  • Most citations: MI (4), OK (3), IN (2).
  • Related part: 1910.305(a) Wiring methods (382 citations).
  • Free 5-minute toolbox talk for your crew below.
19citations, 3 years
$70,940current penalties
19inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.305(a)(1)(i) is one requirement inside 1910.305 Wiring methods, components, and equipment for general use, an OSHA general industry standard (Part 1910, Subpart S). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(i) Metal raceways, cable trays, cable armor, cable sheath, enclosures, frames, fittings, and other metal noncurrent-carrying parts that are to serve as grounding conductors, with or without the use of supplementary equipment grounding conductors, shall be effectively bonded where necessary to ensure electrical continuity and the capacity to conduct safely any fault current likely to be imposed on them. Any nonconductive paint, enamel, or similar coating shall be removed at threads, contact points, and contact surfaces or be connected by means of fittings designed so as to make such removal unnecessary. 19 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.305.

Where and how often it was cited

YearCitations
20234
20247
20257
20261

Top states: MI (4), OK (3), IN (2), KS (2), TX (2)

Largest penalties

EmployerLocationPenalty for this rule
ACME BRICK COTULSA, OK$21,279
TRIUMPH FOODS, LLCSAINT JOSEPH, MO$12,059
AMERICAN SUGAR REFINING INCARABI, LA$9,598
PREMIUM VELOCITY AUTO LLCLEAGUE CITY, TX$6,084
157903 - TRUE2FORM COLLISION REPAIR CENTERS, LLCGARNER, NC$5,850

Free toolbox talk

A 5-minute crew talk on 1910.305(a)(1)(i), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.305(a)(1)(i).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What must be bonded?

Metal raceways, cable trays, cable armor and sheath, enclosures, frames, fittings and other noncurrent-carrying metal parts that serve as grounding conductors.

Why bond them?

To ensure electrical continuity and the capacity to safely conduct any fault current likely to be imposed.

What about painted surfaces?

Coatings must be removed at threads, contact points and surfaces, or fittings designed to make removal unnecessary must be used.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top