29 CFR 1910 · General Industry · Subpart S

1910.305(a)(2)(i)(B): 90-Day Limit on Holiday and Carnival Temporary Wiring

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated November 17, 2026 2 min read

In plain words:

Temporary electrical power and lighting is permitted for Christmas decorative lighting, carnivals and similar purposes for a period not to exceed 90 days.

Key takeaways

  • 1910.305(a)(2)(i)(B) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart S).
  • OSHA cited it 8 times in the last 3 years, in 8 inspections, with $14,660 in current penalties.
  • Related part: 1910.305(a) Wiring methods (374 citations).
  • Free 5-minute toolbox talk for your crew below.

Get the free 5-minute toolbox talk on 1910.305(a)(2)(i)(B) ↓

8citations, 3 years
$14,660current penalties
8inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.305(a)(2)(i)(B) is one requirement inside 1910.305 Wiring methods, components, and equipment for general use, an OSHA general industry standard (Part 1910, Subpart S). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(B) For a period not to exceed 90 days for Christmas decorative lighting, carnivals, and similar purposes; or 8 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.305.

See every company cited for this rule.

Export the list: 8 inspections cited 1910.305(a)(2)(i)(B) in the last 3 years, with employer, location, penalty and date.

Purple Belt, $59/mo

Where and how often it was cited

Free toolbox talk

A 5-minute crew talk on 1910.305(a)(2)(i)(B), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.305(a)(2)(i)(B).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

How long can temporary wiring stay up for holiday lights?

For a period not to exceed 90 days.

What uses does this cover?

Christmas decorative lighting, carnivals and similar purposes.

What happens after 90 days?

The 90-day period cannot be exceeded under this paragraph, so the temporary installation must not stay in place longer.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top